T-type Multi-branch Drilling Technology    

Oil production increased by 6-12 times;

Recovery efficiency of reservoir increased more than 15%

The maxium production of single well after T drilling is 3980ton.

The single well production on off-shore after T drilling is 1100bbls



Classic Cases

2025-04-21

No.

Well 

Layer 

Target formation

Hole

HH length m

Completion depth  (TVD)

Remarks


Window(TVD)

Landing(TVD)

azimuth 

inclation

1

EP23-2-A1

EJ2-16

2621.14

2622.73

110°

89°

60-80

1654.50



The output increased significantly!

The liquid volume (234 bbl / D to 1400 bbl / D) increased by 5.98 times.

The yield (99 bbl / D to 546 bbl / D) increased by 5.5 time


HB oilfield B19block——B19-29

Well B19-29:The reservoir is medium porosity and permeability. The faults in the east and north of the structure are developed. In order to evaluate the remaining oil potential at the lower part of K1baIII layer, the T-type branches were built in the vertical direction of the structural contour.

Well No.

Layer

Well section

(m)

Thicken 

(m)

Depth of sidetrack

(m)

Azimuth 

Horizontal hole length m

inclination

  B19-29

23

1521.6-1528.6

7.0

1521.6

262.4

43.5

-1.3

24

1531.2-1538.8

7.6

1531.2

262.4

42.8

-1.6

Casing  type

     Casing Grade : J55  139.7*7.72*124.26

The picture of T-type well  operation


HB oilfield B19block——B19-29

When the T-type branches were built, the preliminary effect is not obvious. But after a period of water injection to supplement energy, the production increased gradually.


HB oilfield B19block——B19-29

After the implementation of T-type multi-branch technology in this well, the cumulative oil production was 3964 tons, and the cumulative liquid was 9058 m3 . The well production is very stable at present.


©2025 Shanghai Julong Petroleum Well Repair Technology Co., Ltd All Rights Reserved