T-type Multi-branch Drilling Technology    

Oil production increased by 6-12 times;

Recovery efficiency of reservoir increased more than 15%

The maxium production of single well after T drilling is 3980ton.

The single well production on off-shore after T drilling is 1100bbls



Contact us

  • Address: Room J355, No. 66 Miaojing Road, Minhang District, Shanghai

  • Mobile phone: 13681131441

  • Email: zhuxiaoye156831@163.com

        


©2025 Shanghai Julong Petroleum Well Repair Technology Co., Ltd All Rights Reserved