T-type Multi-branch Drilling Technology    

Oil production increased by 6-12 times;

Recovery efficiency of reservoir increased more than 15%

The maxium production of single well after T drilling is 3980ton.

The single well production on off-shore after T drilling is 1100bbls



Service

  • Classic Cases

    2025.04.21

    No.Well Layer Target formationHoleHH length mCompletion depth  (TVD)RemarksWindow(TVD)Landing(TVD)azimuth inclation1EP23-2-A1EJ2-162621.142622.73110°89°60-801654.50The output increased significantly!The liquid volume (234 bbl / D to 1400 bbl / D) increased by 5.98 times
  • Our Achievements

    2025.04.19

    In 2009, we developed T-type drilling technology. From then on, We constantly develop and improve technology in the oil-field application. Now, the ninth generation of drilling product has been made and the technology is gradually mature.As of the year 2022, our company has provided 122 T-type drill
  • How long does it take?

    2025.04.19

    Under normal conditions, T-type well takes:No.Working programWorking-hours (h)Remarks1Depth correction3working hour is difference for different layer;2Azimuth adjusting3Working time is different according to the azi

©2025 Shanghai Julong Petroleum Well Repair Technology Co., Ltd All Rights Reserved